My Build · currently-building
Catahoula Technologies RL1200 Relay Nixie Clock
54-relay board assembled and socketed; waiting on IN-14 tubes and sockets before first power-up
Quick start (the things I forget)
- Power: regulated 12 V DC, at least 2.5 A (3 A is comfortable). Not an unregulated transformer brick: it idles at 15–17 V, over the 16 V sampling caps. Barrel plug centre-positive, so check it with a meter. There is no reverse-polarity protection. (Vol 4 §4.1; CLAUDE.md 2026-11-02)
- Before touching anything: power off, wait 10 s, measure +HV (it should be under 50 V in about 3 s). The NIXIE SUPPLY strip makes ~180 V whenever the board is powered. Work one-handed. (Vol 3 §3.6)
- Power-up always shows 01:00. Every relay starts released. A power cut loses the time, and there is no battery backup. (Vol 4 §4.2, §4.4)
- Setting the time: SW2 to SET, SW1 FAST (8 min/s) to get close, then SLOW (1 min/s), stop on the minute, then SW2 back to RUN. If FAST skips, use SLOW. (Vol 4 §4.2)
- My switches are toggles, so the silkscreen reads backwards. A toggle lever points away from the contact it makes. Go by what the clock does, not by the SET/RUN and FAST/SLOW printing. (Vol 3 §3.8, 2026-11-02)
- The seconds can’t be zeroed. Set the minute while watching a reference clock and accept an offset of a few seconds. (Vol 4 §4.2)
- Clock runs 60× fast → SW2 left in SET, or a 1 Hz signal on J6. J6 EXT CLK is a once-a-minute input, whatever the datasheet says. (Vol 4 §4.5–4.6)
- Hours all off by one → J4 is wired in J5’s order. J4 runs 0,9,8…1; J5 runs 9…0. (Vol 3 §3.5)
- Fault-finding: every register bit has an LED, and the CLR signals have D10 (1 MIN), D3 (10 MIN) and D1 (12 HR). Compare them with Vol 1. Symptom table: Vol 4 §4.6.
- Never add flyback diodes to the relay coils. The +1 relays have bidirectional coils, and a diode would short +12 V. (CLAUDE.md, decided 2026-10-29)
What’s on it now
| Part | What | Version | Since | Notes |
|---|---|---|---|---|
| Board | RL1200, “4 DIGIT CLOCK WITH RELAY LOGIC”, 54-relay revision (no K46) | — | 2026-10-28 | Vol 3 §3.1 |
| Relays | 54 × Omron G2R-2-12VDC, all socketed, retaining bails | — | 2026-11-02 | |
| Timebase | Y1 Würth WE-XTAL 4.194304 MHz; U1 CD4521BE; U2/U3 CD4017BE (socketed) | — | 2026-11-02 | No trimmer. C3 sets the crystal load (Vol 4 §4.3) |
| HV controller | U4 MC34063AP (socketed), one spare on hand | — | 2026-11-02 | |
| Q1 /CLK switch | STF38N65M5 | — | 2026-11-02 | Not the STF8N65M5 that was decided. Fine at Q1 |
| Q3 HV switch | STF38N65M5 | — | 2026-11-02 | 71 nC gate charge. Check its temperature at HV bring-up; swap to STF8N65M5 if too hot to hold |
| Q2 | 2N3906 | — | 2026-11-02 | Under the folded-over Q3 |
| L1 | Würth 744743101, 100 µH, 2.1 A sat, upright, far lead sleeved | — | 2026-11-02 | |
| D28, D34 | UF4004 | — | 2026-11-02 | |
| HV set | R56 3.30 kΩ (target 176–183 V); anodes R62–R65 18 kΩ | — | 2026-11-02 | For IN-14s at ~2.2 mA |
| Current sense | R43 0.47 Ω ∥ R44 0.51 Ω | — | 2026-11-02 | |
| C16 HV reservoir | 4.7 µF 350 V | — | 2026-11-02 | Polarity checked |
| C13 | 100 µF 25 V | — | 2026-10-28 | |
| Sampling caps | 10 × Würth 860020374012, 470 µF 16 V 105 °C | — | 2026-11-02 | First suspects if a bit misbehaves in years to come |
| Switches | SW1 SLOW/FAST, SW2 SET/RUN: toggles | — | 2026-11-02 | Silkscreen sense reversed |
| Headers | J1, J2, J4, J5 fitted; J6 EXT CLK empty (optional) | — | 2026-11-02 | ❓ check J3. Leading zero kept: J2 pin 3 wired |
| Tubes | 4 × IN-14 NOS, with base rings | — | ❓ check | Ordered 2026-10-28, not here yet |
| Tube sockets | 4 × IN-14 PCB sockets | — | ❓ check | Ordered, not here yet. Wire by solder-side label (Vol 3 §3.5) |
| 12 V supply | Regulated 12 V ≥2.5 A, centre-positive | — | ❓ check | ❓ check which adapter |
How to update
There is no firmware. The things that change are the HV setpoint, the timing calibration and worn parts.
First power-up / HV bring-up (do this before anything else)
- Bench supply at 12 V, current-limited (2 A limit with the board fully built, per my 2026-11-02 plan).
- Meter on its 200 V+ range, clipped on before power. Expect 176–183 V with R56 = 3.30 kΩ.
- Power off and time the bleed: under 50 V in about 3 s. If it doesn’t bleed, stop, because the divider is open.
- Load it with a 47 kΩ 2 W dummy (or one tube on 18 kΩ: ~39 V across it = 2.2 mA) for 30 minutes. Then, with power off and C16 bled, feel L1, D28 and Q3. If Q3 is too hot to hold, fit an STF8N65M5.
- Then the register tests, stage by stage (Vol 3 §3.4).
- Update the table above and add a line to the Log.
(Vol 2 §2.6; CLAUDE.md 2026-11-02)
Accuracy trim
- Compare the seconds LEDs with a reference over a week.
- If it runs consistently fast or slow, change C3 (33 pF; larger = slower). There are no trimmer pads. (Vol 4 §4.3)
- Update the table above and add a line to the Log.
Relays and capacitors
The six sampling relays switch 525,600 times a year, which is why every relay is socketed: swap a suspect relay. If a register bit starts failing after years, suspect its 470 µF capacitor first. (Vol 4 §4.7)
Modifications
- All 54 relays socketed instead of soldered, with retaining bails so the board can hang on a wall. (Decided 2026-10-28)
- IN-14 tubes instead of the designer’s CD72s. That meant R56 3.30 kΩ (~179 V), 18 kΩ anodes, D28/D34 UF4004, C16 350 V, and a 650 V MOSFET at Q3. (Vol 2 §2.5)
- Q1 and Q3 are STF38N65M5, not the planned STF8N65M5. (2026-11-02)
- Toggle switches in the slide-switch footprints for SW1/SW2. (2026-11-02)
- Leading zero kept (J2 pin 3 wired).
Next up
❓ date: when the tubes and sockets arrive
- First power-up and HV bring-up (How to update above); check Q3’s temperature
- Register tests (Vol 3 §3.4, Stages 2–5)
- Wire the four IN-14 sockets by label; fit the tubes (Vol 3 §3.5, Stage 6)
- Laser-cut acrylic case: engraved dark back, spacers, clear front, tube shelf (Vol 4 §4.7). Still to settle: the size of the back and the wall hanger
- Decide on the optional WLED underglow (Vol 5)
Log
Newest first. One dated line per change.
- 2026-11-02 — Fitted R11, R43/R44, U1–U4 in sockets, Y1, SW1/SW2 (toggles), Q1/Q3 (STF38N65M5), Q2, L1, D28/D34, R7, R33, C16 and all ten 470 µF caps, and headers J1/J2/J4/J5. All 54 relays seated with bails. Pre-power checks done. The board is assembled; it is waiting on the tubes and sockets.
- 2026-10-29 — Dry-fitted the 470 µF sampling caps (fit with care; C8/C11 tightest). Planned the acrylic case. Decided: no flyback diodes.
- 2026-10-28 — Board in hand (54-relay revision). Fitted most resistors and the small caps; test-fitted relay sockets. Chose and ordered IN-14 NOS tubes and sockets, and made all the HV supply decisions.
Where the details are
| Need | Volume |
|---|---|
| How the relay logic counts | Volume 1 — How It Works |
| HV supply, values, bring-up | Volume 2 — The Nixie Power Supply §2.5–2.6 |
| Build order, IN-14 socket wiring, build log | Volume 3 — Building It §3.4–3.8 |
| Power, setting the time, troubleshooting, case | Volume 4 — Running It |
| Optional underglow | Volume 5 |