My Build · currently-building
KABtronics Nixie Transistor Clock
Bare version-5 PCB with all parts ordered; the HV supply parts have arrived, nothing soldered yet
Quick start (the things I forget)
- Power: 12 V AC, not DC. The clock counts the 60 Hz mains, so a DC adapter powers the logic but the clock never advances. It draws about 1.2 A (14.4 W). The 50/60 Hz jumper must be set to 60. (Vol 4 §4.1)
- “+12 V” is unregulated, about 14–18 V. Don’t fit parts rated at 16 V on it. (CLAUDE.md; Vol 5 C59)
- The HV cap bites long after power-off. C73 (120 µF) holds 1.6–1.9 J. I fitted a 150 kΩ bleeder, which brings it to ~20 V in about 25 s instead of ~90 s. Measure before touching anyway. Dark tubes, including during shut-off hours, do not mean a safe board. (Vol 2 §2.3, §2.5; Vol 4 §4.4)
- Setting the time: H, M, S buttons step hours, minutes, seconds. To set to the second, hold Seconds Hold (SW3) and release it on the beat of a reference clock. (Vol 4 §4.2)
- 24-hour with leading zeros (my choice): 00:00–23:59, so the 10-hour tube shows 0. (CLAUDE.md decisions)
- No backup. A power cut stops it, and it has to be set again. (Vol 4 §4.1)
- Counters glitch when I touch the board or probe it → normal. The flip-flops are finger- and probe-sensitive. (Vol 4 §4.5)
- Clock gains time → mains noise is getting past the 60 Hz extractor. Check its capacitor and comparators. (Vol 4 §4.5)
- Tubes: IN-12A sockets are not soldered to the PCB; they’re wired by hookup wire. Pin 1 is white inside the glass and goes lower-right. (Vol 3 §3.5)
What’s on it now
Nothing is soldered yet. The table shows what has been decided or received for this board.
| Part | What | Version | Since | Notes |
|---|---|---|---|---|
| PCB | KABtronics Nixie Transistor Clock, version 5, “(c) KABtronics 2024”, bare board only | — | 2026-10-29 | Manual 1.7 matches it. Mods 1 and 3 don’t apply; Mod 2 is “older version only” |
| Q139 HV switch | onsemi MJE5742G (400 V 8 A Darlington) | — | 2026-11-02 (received) | BOM leaves it unidentified. Alternate ST901T. Not TIP120 or BU806 |
| L1 | Bourns 2216-V-RC (220 µH) | — | 2026-11-02 (received) | No Isat on the datasheet. Scope the peak; if >2.8 A, use PWR 0.56 Ω |
| C73 HV cap | Nichicon UCY2E121MHD3, 120 µF 250 V 105 °C, lying down, tie-wrapped | — | 2026-11-02 (received) | |
| Bleeder | TE H4P150KFCA, 150 kΩ 1 W, 500 V, across C73 | — | 2026-11-02 (received) | ~0.22 W at 180 V |
| C1, C72 | 2 × Rubycon 25PX6800MEFC16X31.5, 6,800 µF 25 V, lying down | — | 2026-11-02 (received) | C1 bottom-left, C72 top-right (CLAUDE.md decisions) |
| R333 (PWR) | Vishay PAC10000470FA1000, 0.47 Ω 1 % 1 W | — | 2026-11-02 (received) | 1 W because that was in stock; it fits |
| SNS | 348 k / 357 k / 390 k set | — | 2026-11-02 (received) | Target ~165 V |
| Fuse | 3 A (schematic says 2 A; 3 A is correct) | — | ❓ check | |
| Cathode drivers | 46 × JSCJ 3DD13003B (replacing the obsolete STX13003G) | — | ❓ check | The “B”: E-C-B like the ST part. Not MPSA42, not plain 3DD13003. Pinout check: Vol 5 §5.5 |
| Bridge | 1N5818 | — | ❓ check | BOM vs schematic conflict; 1N5818 wins |
| C59 | 25 V electrolytic (replacing the BOM’s 16 V tantalum) | — | ❓ check | |
| D99 | UF5404 (MR854 is EOL) | — | ❓ check | |
| Tubes | 6 × IN-12A NOS + floating-pin sockets | — | ❓ check | On order |
| Neons, test LEDs | NE-2s; test LEDs | — | 2026-11-02 (received) | |
| Transformer | 12 VAC wall adapter, ≥1.2 A | — | ❓ check | ❓ check which one |
Live part status is in my parts tracker (private artifact, linked from ../CLAUDE.md).
How to update
There is no firmware. What changes is the HV setpoint and, over the years, the capacitors and tubes.
HV bring-up (once, and again after any HV-section repair)
Build the HV supply last, after all the logic works. Then:
- Load the HV parts except FUSE, PWR and SNS. Fit stand-ins: 47 kΩ in SNS, 10 Ω in PWR, 22 Ω in FUSE.
- Power for under a second and read C73: about 25.5 V. Over 30 V: unplug and debug.
- Fit the real 0.47 Ω PWR and the 3 A fuse. Confirm 25.5 V again, and scope the current across PWR (2 A reads 0.94 V). This is where L1’s real saturation shows up.
- Fit 357 kΩ SNS. From here the board is lethal. Confirm ~165 V. Above 167 V, swap to 348 k; below 160 V, swap to 390 k. Stay near 165 V, because higher overheats the transformer.
- Update the table above and add a line to the Log.
(Vol 2 §2.2, §2.4)
Hour shut-off
Load a diode in an hour’s shut-off position to blank the tubes for that hour; the counters keep running. ❓ check: which hours (still an open question in CLAUDE.md). (Vol 4 §4.4)
Ageing parts
Electrolytics may need replacing after 5–15 years. Watch C73 first. (Vol 4 §4.6)
Modifications
- Bleeder resistor across C73 (150 kΩ, 1 W, 500 V), not on the board. (Vol 2 §2.5)
- C1, C72 and C73 lie down, tie-wrapped.
- 24-hour, leading-zero diodes loaded.
- 3DD13003B cathode drivers in place of the obsolete STX13003G.
- R333 at 1 W instead of ½ W.
Next up
❓ date: as the rest of the parts arrive
- Receive the transistors, diodes, tubes and sockets, logic resistors, small caps and hardware
- Ohmmeter pinout check on a 3DD13003B before fitting all 46 (Vol 5 §5.5)
- Build in the manual’s stages: 12 V supply and 60 Hz → seconds → counters → hours → HV last → displays (Vol 3 §3.4)
- Decide which hours (if any) to shut off
- Mount it “up high, behind glass” (Vol 4 §4.6)
Log
Newest first. One dated line per change.
- 2026-11-02 — First parts in, including the whole HV supply: MJE5742G, 2216-V-RC, C73, C1/C72, the bleeder, R333, the SNS set, LEDs and NE-2s.
- 2026-10-30 — Ordered every part. The 220 µH inductor was the hard one; I got a Bourns 2216-V-RC from DigiKey.
- 2026-10-29 — Bare version-5 board in hand; photographed front and back. Decided on 24-hour with leading zeros, the bleeder, lying-down caps, and sourcing every part myself. Caught the STX13003G → MPSA42 pinout mismatch; the replacement is now 3DD13003B.
Where the details are
| Need | Volume |
|---|---|
| How the transistor logic counts | Volume 1 — How It Works |
| HV supply, SNS values, bring-up, bleeder | Volume 2 — The High-Voltage Supply |
| Board map, build order, tube wiring, build log | Volume 3 — Building It |
| Power, setting the time, troubleshooting | Volume 4 — Running It |
| Full BOM, substitutes, driver pinout | Volume 5 — Sourcing the Parts |